Butters Bridge
Chief Minister, Treasury & Economic Development Directorate, Roads ACT & Icon Water
Canberra, Australian Capital Territory, Australia
Truly innovative thinking means Butters Bridge is no ordinary bridge
Butters Bridge is no ordinary bridge. In a true demonstration of innovative thinking, it boasts dual functions, conveying a 600mm diameter sewer and providing a pedestrian and cycling link across the Molonglo River corridor.
Rising to 27m above the river, the 242m long bridge is a vital piece of infrastructure in the development of Canberra’s newest region, the Molonglo Valley. It links Molonglo 2 on the south of the river to Molonglo 3 in the north, delivering sewer services to neighbouring suburbs.
The sewer, located snugly within the 5.25m wide bridge deck, connects to a major outfall sewer in the north that already services around 60% of Canberra. The new sewer will service upwards of 7,500 dwellings, including the future Molonglo Valley town centre. The bridge will also connect to Canberra’s extensive cycle network and form part of an envisaged recreation hub for the surrounding communities.
Butters Bridge
Generating cost savings
The bridge design defers the need to construct a permanent road bridge over the river until the new suburbs are completed, resulting in a saving in excess of $10million for the ACT Government. The future road bridge, which will be constructed at another location nearby, will be constructed much lower and of significantly reduced length as it now does not need to accommodate the sewer.



Considering environmental impacts in our solution
Calibre Built Environment was engaged to determine the optimal location and structural form of the bridge. The challenge was to minimise impact on the Environment Protection and Conservation listed area, which had been identified as a potential habitat for the rare pink-tailed worm-lizard.
Our team investigated a number of different bridge types before recommending an incrementally launched prestressed and reinforced concrete box girder cast in seven segments. This innovative solution enabled us to increase the length of the bridge spans and reduce the number of piers impacting the land. The maximum deck span (63.25m) is one of the longest incrementally launched spans in Australia.
Another innovative solution was to retain the steel tubes which were used to form the concrete piers. The tubes were filled on site and rather than removing them once the concrete was set, were left to naturally oxidise. This enabled more efficient and convenient construction and enhanced the aesthetic value. With the concrete doing the hard support work, the organic appearance of the oxidized steel helps the bridge to blend in with the natural surrounds.
Our team subsequently prepared the development application, detail design and tender documentation, and administrated the construction contract.